- Works will continue in the Urban Orchard area with the installation of porous paving, installation of the last section of turf, filling of planter boxes and planting of trees.
- Landscaping works in the Central Square area will continue with mulching, planting, and installation of seating.
- Works will continue in the Museum area with the installation of irrigation and turf to the earth mounds, and work on the Beaufort Street planter box.
- Work will continue in the new Wetland area with the painting of the stairs and installation of tactile paving.
- The vent demolition near the Roe Street overpass will continue with the removal of the block work underneath the slab and the fabrication of the vents.
- Mulching and planting in the area in front of PICA.
- Various electrical works continue to be undertaken throughout the site.
William Street
Works
- Painting at Lot 1297.
- Internal works and ablutions at Lot 1297.
- Painting and carpentry works at Lot 1115.
- Storm water and sewer services at Lots 1279-1283 and Lot 404.
- Electrical and plumbing works at Lots 1279-1283 and Lot 404.
- Facade works at Lot 1279-1280.
- Carpentry works at Lots 1279-1283 and Lot 404.